EMH Overhead Cranes in Power Plants
This 130/25/15 ton, 105 foot span, double girder gantry is used to install and service turbines at on overseas power plant. The cranes uses three EMH Engineered hoists. Two are mounted on a double girder trolley with service walkways, and a torsion mounted hoist runs along the side of one girder. The crane uses eight bridge drives. The all-inverter controls are mounted in a stainless steel enclosure, which is covered by a sun shade, and air conditioned.
This 130/25/15 ton, 105 foot span, double girder gantry is used to install and service turbines at on overseas power plant. The cranes uses three EMH Engineered hoists. Two are mounted on a double girder trolley with service walkways, and a torsion mounted hoist runs along the side of one girder. The crane uses eight bridge drives. The all-inverter controls are mounted in a stainless steel enclosure, which is covered by a sun shade, and air conditioned.